// Landing pages

Landing Page Service Cost and What You Actually Receive

A landing page costs Rp 4.9 million for 1 page in 7 to 10 working days. Read the cost parts, what the package includes, and how to read a quotation.

Landing Page Service Cost and What You Actually Receive

A landing page price moves with four things: block count, material readiness, tracking scope, and revision count. Two quotations with the same number can hold quite different work.

Parts that form the price

Structure and copySetting the block order and writing the offer sentences.Design and buildBuilding a responsive page and testing it on phones.Base trackingInstalling the form or purchase event, then checking it.Release and handoverPublishing the page and handing over code and edit notes.

Scroll the diagram sideways

Ask the quotation to separate these four lines. One combined number hides missing work.

Price and what the package includes

Our landing page build service costs Rp 4.9 million for 1 page, with a work time of 7 to 10 working days. The price includes copywriting, a responsive design, basic tracking, and 1 revision round. Extra pages and a wider tracking scope are quoted separately.

ConditionEffect on cost
Copy and photos are readyWork time is shorter. The price stays the same.
Full copywriting is neededIncluded. Work time uses the upper limit.
The Conversions APICAPIA server path that sends conversion data from your system to the ad platform, without depending on the buyer browser.What is the Conversions API (CAPI)? is neededServer work is required. It is quoted separately.
Three languages are neededEach language adds a page and a test round. It is quoted separately.

How to read a quotation

A clear quotation•States the block count•States the revision count•States the tracking scope•States who owns the codeA vague quotation•Says "a complete page"•Unlimited revisions•No mention of tracking•No code handover

Scroll the diagram sideways

Question a quotation that never names the code owner. You need that code when you change vendor.

Costs people forget

  • The domain name and its yearly renewal.
  • Product photos or video, when you do not own them yet.
  • Copy changes after the campaign starts.
  • A recheck after the theme or checkout changes.

Questions and answers

Does a cheap page mean a poor result? Not automatically. A simple page with a clear offer can beat an expensive page with a vague message. Offer clarity and traffic quality decide the outcome.

How long does the build take? A single-offer page takes 7 to 10 working days after the materials are ready. A photo shoot adds time.

Do I receive the code? Ask for code handover and edit notes in the contract. Without them, every small change depends on one party.

// references

Official sources

We checked every claim on this page against the documents below on 17 September 2026. Open the source before you change a live system.

// next step

Need help to apply this?

Send your target. We check the context and write the first step before implementation.